link: separator in the Controller B update log line; wiki: B update verified end-to-end
Firmware / build (push) Successful in 7m29s
Firmware / build (push) Successful in 7m29s
This commit is contained in:
@@ -108,7 +108,7 @@ Wi-Fi must be joined first — Settings → Wi-Fi (remembered from then on) or `
|
||||
|
||||
## Controller B (implemented 2026-09-27)
|
||||
|
||||
The 2026-09-26 idea (A streams B's image over ESP-NOW) was dropped for a **pull design** the user chose on 2026-09-27: B downloads its own signed release (target `patrol-b`, B's repo, same key) over Wi-Fi; A only hands over the credentials and the trigger. Full design, verification state and the first-pairing procedure live in B's wiki (`../../ESP32-S3-LCD-1.3/wiki/pages/controller-b-ota.md`). A's side: `src/modules/link_peer.cpp` - `link pair` sends a random key over the UART wire once (never by radio; both repos are public), B's `STATUS` frames (version, phase, progress) arrive over ESP-NOW unicast, credentials and OTA commands go to B inside AES-256-GCM `SECURE` frames, and Settings → Updates gained a **Controller B** card (Installed / Latest / Check / Install) next to Controller A's. B's install is behind the same parking gate plus "A must be on Wi-Fi" (same AP ⇒ same channel ⇒ B's progress frames keep arriving). Console: `link status | pair | unpair | creds | ota check | ota install [force] | ota rollback`. Verified on the bench: STATUS frames and every refusal path; pairing itself waits for the wire to be connected.
|
||||
The 2026-09-26 idea (A streams B's image over ESP-NOW) was dropped for a **pull design** the user chose on 2026-09-27: B downloads its own signed release (target `patrol-b`, B's repo, same key) over Wi-Fi; A only hands over the credentials and the trigger. Full design, verification state and the first-pairing procedure live in B's wiki (`../../ESP32-S3-LCD-1.3/wiki/pages/controller-b-ota.md`). A's side: `src/modules/link_peer.cpp` - `link pair` sends a random key over the UART wire once (never by radio; both repos are public), B's `STATUS` frames (version, phase, progress) arrive over ESP-NOW unicast, credentials and OTA commands go to B inside AES-256-GCM `SECURE` frames, and Settings → Updates gained a **Controller B** card (Installed / Latest / Check / Install) next to Controller A's. B's install is behind the same parking gate plus "A must be on Wi-Fi" (same AP ⇒ same channel ⇒ B's progress frames keep arriving). Console: `link status | pair | unpair | creds | ota check | ota install [force] | ota rollback`. **Verified end-to-end on the bench 2026-09-27**: `link pair` over the wire, automatic credential push, `link ota check` / `link ota install` from A's console took B from `dev` to `v0.1.0` (1,248,432 B in ~50 s), B rebooted, reported `v0.1.0` and confirmed itself after 30 s. The Updates-page buttons share the same request functions but have not been tapped yet.
|
||||
|
||||
## Related
|
||||
|
||||
|
||||
Reference in New Issue
Block a user