wiki: passage-confirmation design and stage-73ada89 deploy notes (2026-10-24)

Wiki pages written on 2026-10-24 but left uncommitted before the Windows to
Linux migration: passage-confirmation concept, open question 20, deploy and
query log entries, index line, incident and barrier page updates. Drops the
stray tracked __pycache__ file. Line endings normalised to LF.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
This commit is contained in:
2026-11-07 09:38:32 +01:00
parent f5f8865309
commit 580412aa50
8 changed files with 159 additions and 0 deletions
+116
View File
@@ -0,0 +1,116 @@
---
type: concept
tags: [parking, vision, barrier, lane, ledger, safety, design]
sources: []
updated: 2026-10-24
status: open
---
# Passage confirmation — did the car actually cross? (design, 2026-10-24)
**Problem (user, 2026-10-24).** A motion push opens the barrier and signs the entry/exit. If the
driver changes their mind and reverses out, the ledger holds a false entry, and — because the
barrier operator at the sites closes **only when its sensor/radar is tripped by a passage** — the
boom stays up until the next car trips it. That next car enters with no ticket, no read, no ledger
row. So an abandoned entry is both a wrong row and a free pass. Related: the FIFO stale-occurrence
problem seen on AB694XU the same day (an exit closes the oldest open occurrence; one double read
leaves a subscriber permanently one stay behind).
**Constraint (user).** The cameras are the cheap Hikvision DS-2CD1043G2-LIU: motion push with a
vehicle target, a sub-stream, and no line-crossing / smart events. The booth PC does the thinking.
Cameras are sensors; compute is ours. The Dahua bench unit has tripwire (`CrossLineDetection`) but
that is not the fleet camera.
## Design
1. **Frames: the RTSP sub-stream, not ISAPI stills.** Keep one RTSP session open per camera
permanently (avoids the keyframe start-up gap of 1–2 s; set the sub-stream I-frame interval to
≤ 1 s). Decode in the vision service (OpenCV 4.13 with FFmpeg is already in the container; no
`ffmpeg` binary needed). The still-pull loop in `anpr-entry.ts` is replaced by this — it also
removes the single-threaded picture-endpoint collisions (503s).
*Latency (user asked 2026-10-24):* RTSP itself adds nothing meaningful; the delay is the
camera's encoder (~100–300 ms) plus whatever the decoder buffers. Open the stream with a
minimal buffer (`CAP_PROP_BUFFERSIZE 1`, TCP transport, drop to the newest frame), and the
watcher sees a frame well under half a second after the event. The 1–2 s start-up gap is a
keyframe wait, which is why the session stays open. To be measured on park-lab against the
motion-push timestamp once a camera is on the bench.
2. **Trigger and window.** Nothing runs while the lane is empty. A motion push starts a *watch* on
that camera; it holds while pushes keep arriving (1–3 s apart while a car moves — see
[[lane-presence-and-anpr-entry]]) and ends a few seconds after they stop, or at a hard cap.
3. **Detection + tracking.** The existing YOLOX vehicle detector gives a box per car; a small
in-house tracker matches boxes between frames by overlap and follows each track's
**bottom-centre point** (ground contact; stable under perspective). No tracker library.
4. **The segment.** Drawn once per camera in Setup over a live frame; stored as two normalised
points + which side is A, in the same normalised frame the plate/vehicle boxes already use.
Crossing = sign change of the cross product of the tracked point against the segment. A→B on
the entry camera is a passage; the exit camera has its own line. A→B→A inside the window is a
reversal (not a passage). The verdict carries the track's plate if ANPR read one on it.
5. **One watcher, two consumers.** The same decoded frames feed the ANPR bridge (subscriber
auto-open) and the crossing tracker (confirmation).
6. **Lane state becomes positive.** Busy while any track is between the line and the boom; free
when the last track crossed or left the frame; the 30 s TTL stays only as a fallback when the
stream is down. `vehicle_passed` ⇒ lane free *unless another track is present* (tailgating).
This is the software form of the pass-through sensor [[entry-double-press]] asked for.
### Ledger semantics (append-only, unchanged open path)
- `vehicle_entry` / `vehicle_exit` remain **intent**: the barrier was commanded open. The open is
never delayed by confirmation.
- `vehicle_passed` (new, signed): the crossing was seen, with how (vision track) and the plate.
- `entry.abandoned` / `exit.abandoned` (new, signed): window ended with no crossing. Closes the
occurrence; a printed ticket is **invalidated** so the paper cannot be handed to the next car.
- *unverified*: vision/stream unavailable — recorded as such; the stay counts (benefit of doubt).
Occupancy and the active list count passed + unverified; abandoned are listed as what they are.
A subscriber's stay only exists once the car is seen to cross — which also kills the stale
FIFO occurrence at its root.
### Closing the boom after an abandonment — evidence-driven, never timed
[[barrier-not-a-door]] stays: no timed close. A close may be **expressed** (a pulse on a spare
Dingtian channel into the operator's *close* input) only when **all** hold: an abandoned verdict;
the tracker reports nothing between the line and the boom and nothing approaching, for a few
seconds; no new open since; the watch is alive (stream up, verdict fresh); and the close is itself
a signed event with the last frame attached. Vision down ⇒ no close, ever (today's behaviour).
The operator's safety devices (loop / photocell) must be verified to override a close command
on the real unit before this ships. Requires a revision (not repeal) of the standing decision,
with the test results attached.
## Test plan — on park-lab (user, 2026-10-24: "we will test it on park-lab")
1. Confirm the operator's close input; wire a spare relay to it.
2. Close with a car on the safety loop → boom must not move / must reverse.
3. Close with the photocell beam broken by a person → same.
4. Reversal: open, back out, window expires → close pulses, boom comes down.
5. Tailgate: second car approaching while the first backs out → the tracker holds the close.
6. Vision service stopped: reversal again → boom stays up, event logged unverified.
## Measured on park-lab (2026-10-24, i5-9500, vision container, CPU only)
YOLOX-S ONNX, input fixed at 640 by the exported graph (smaller inputs need a re-export):
| intra-op threads | ms / frame (p50) | ≈ fps on that budget |
| --- | --- | --- |
| 2 (service default) | 132 | 7.5 |
| 4 | 79 | 12.5 |
| 6 | 66–70 | 14 |
Decode of a 704×576 sub-stream frame is < 1 ms (MPEG-4 part 2 proxy; H.264/H.265 will be a few
ms) — negligible next to inference. So one lane at 5–6 fps costs ~0.7–0.8 of two cores during a
watch and nothing between watches; two lanes at once need 4 threads or detection on alternate
frames with the tracker interpolating. Cheaper still: re-export YOLOX at 416 (~2.4× fewer FLOPs)
or switch to YOLOX-Tiny/Nano for the tracker (the plate stage keeps its own detector).
**Still needed to measure the stream path:** a camera on the bench. The lab Dahua (10.0.10.11) was
off on 2026-10-24; the office Hikvisions on the same net (10.0.10.122/.125/.126/.128) need
credentials. Nothing of park-lab's device registry has a camera yet (only the relay emulator).
## Open questions
- Re-export YOLOX at 416 vs YOLOX-Tiny for the tracker — accuracy on far cars at the line?
- Window cap and "lane clear" dwell before a close (start: cap 60 s, dwell 3 s).
- Does the DS-2CD1043G2-LIU keep pushing VMD for a car *reversing*? (It should — motion is motion.)
- Stream-to-event latency and frame drop rate on the booth PC (measure, don't assume).
- Which barrier operator model is at the sites, and does park-lab have one for steps 1–6?
Related: [[lane-presence-and-anpr-entry]], [[barrier-not-a-door]], [[entry-double-press]],
[[append-only-event-chain]], [[opencv-anpr-service]], [[park-2-event-loop-stall]].