wiki: passage confirmation — zone PoC, flow and relay rules, trials, hardening list
- passage-confirmation: unexplained passages as the audit witness and the phase-1 order (2026-11-19), first recordings, and the decisions of 2026-11-22: the zone flow (last crossing counts, no decision while the zone is busy, an uncrossed open is abandoned) and the read-then-fire relay rules. - zone-anpr-poc: the prototype on park-lab, its builds, the live R2 trials and the turn-back judged as passed; park-lab as the worst-case site. - zone-anpr-plate-trials: plate reading measured (inverting does not help; the still is the main reader; the plate reads only on a short stretch of the approach), the day and wet-night trials, and the two fixes that followed. - zone-anpr-poc-review: the code review of 2026-11-21 with a status table of what the later builds fixed. - vision-hardening: the work list the user deferred to another session. - zkteco-cmp200-barrier, append-only-event-chain, reconciliation, open-questions, overview, index, log: cross-references and updates. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01RZgP5oZdzvo92Eouc9eRv5
This commit is contained in:
@@ -24,6 +24,8 @@ Only design for that if it's genuinely true. The network-free fallback controls
|
||||
- the signed, hash-chained log ([[append-only-event-chain]]),
|
||||
- physically **pre-numbered ticket stock**,
|
||||
- **end-of-shift signed Z-reports**,
|
||||
- **CCTV/LPR footage** as an independent record (see [[lpr-camera]]).
|
||||
- **CCTV/LPR footage** as an independent record (see [[lpr-camera]]). The planned form of this is
|
||||
the camera witnessing a crossing with no signed open behind it, recorded as an
|
||||
unexplained-passage anomaly ([[passage-confirmation]]).
|
||||
|
||||
Establishing *some* periodic reconciliation channel is [[open-questions]] #4.
|
||||
|
||||
Reference in New Issue
Block a user