wiki: passage confirmation — zone PoC, flow and relay rules, trials, hardening list

- passage-confirmation: unexplained passages as the audit witness and the
  phase-1 order (2026-11-19), first recordings, and the decisions of
  2026-11-22: the zone flow (last crossing counts, no decision while the zone
  is busy, an uncrossed open is abandoned) and the read-then-fire relay rules.
- zone-anpr-poc: the prototype on park-lab, its builds, the live R2 trials and
  the turn-back judged as passed; park-lab as the worst-case site.
- zone-anpr-plate-trials: plate reading measured (inverting does not help; the
  still is the main reader; the plate reads only on a short stretch of the
  approach), the day and wet-night trials, and the two fixes that followed.
- zone-anpr-poc-review: the code review of 2026-11-21 with a status table of
  what the later builds fixed.
- vision-hardening: the work list the user deferred to another session.
- zkteco-cmp200-barrier, append-only-event-chain, reconciliation,
  open-questions, overview, index, log: cross-references and updates.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01RZgP5oZdzvo92Eouc9eRv5
This commit is contained in:
2026-11-22 18:24:48 +01:00
parent ce10c741fc
commit 726dd9803a
12 changed files with 1446 additions and 9 deletions
+10 -1
View File
@@ -2,7 +2,7 @@
type: entity
tags: [parking, hardware, barrier, relay, wiring]
sources: []
updated: 2026-11-14
updated: 2026-11-22
---
# ZKTeco CMP200 Barrier Gate
@@ -63,10 +63,19 @@ The v1.0 board has no RS485 and no `CAR`. The 4-pin `REMOTE` header takes the 43
permanent close command; closes on controller power loss). Per the manual a `DET` or `PHO`
contact reverses a falling boom, so the close is not blind **if a detector is fitted** — to be
proven on the unit (test plan steps 2–3 there) before any use.
- **Dingtian "Mutually Exclusive" is not this interlock (user, 2026-11-21).** The board can pair two
relays so that switching A on turns B off ("to protect the motor"). That makes the **last**
command win: a close on relay 2 would cut a held open on relay 1. The series wiring above makes
**open** win (relay 2 is dead while relay 1 is on), which is what [[barrier-not-a-door]] needs.
The board setting may be enabled as well, but it does not replace the wiring, nor the `DET`/`PHO`
proof on the unit.
- **Status back to the host:** `O.LM OUT` and `C.LM OUT` are volt-free contacts, so they can go
straight onto two Dingtian inputs (contact to GND, like the button). That gives the host a real
"boom reached open / closed" signal for [[device-status-monitoring]] and for the anomaly "boom
opened with no signed host command" ([[threat-model]]).
- **The close does not need that signal (user, 2026-11-22).** R2 fires on an abandoned open
without looking at the boom, and a close on a closed boom is expected to do nothing (not yet
tried on the unit). The relay rules are on [[passage-confirmation]], "Relay rules".
- **Sharing a detector:** a radar/loop with one dry contact cannot feed both `DET` and a Dingtian
input directly (two different supplies on one contact). Use a detector with two relay outputs
or an interposing relay.