726dd9803a
- passage-confirmation: unexplained passages as the audit witness and the phase-1 order (2026-11-19), first recordings, and the decisions of 2026-11-22: the zone flow (last crossing counts, no decision while the zone is busy, an uncrossed open is abandoned) and the read-then-fire relay rules. - zone-anpr-poc: the prototype on park-lab, its builds, the live R2 trials and the turn-back judged as passed; park-lab as the worst-case site. - zone-anpr-plate-trials: plate reading measured (inverting does not help; the still is the main reader; the plate reads only on a short stretch of the approach), the day and wet-night trials, and the two fixes that followed. - zone-anpr-poc-review: the code review of 2026-11-21 with a status table of what the later builds fixed. - vision-hardening: the work list the user deferred to another session. - zkteco-cmp200-barrier, append-only-event-chain, reconciliation, open-questions, overview, index, log: cross-references and updates. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01RZgP5oZdzvo92Eouc9eRv5
376 lines
25 KiB
Markdown
376 lines
25 KiB
Markdown
---
|
||
type: concept
|
||
tags: [parking, vision, barrier, lane, ledger, safety, design]
|
||
sources: []
|
||
updated: 2026-11-22
|
||
status: open
|
||
---
|
||
|
||
# Passage confirmation — did the car actually cross? (design, 2026-10-24)
|
||
|
||
**Problem (user, 2026-10-24).** A motion push opens the barrier and signs the entry/exit. If the
|
||
driver changes their mind and reverses out, the ledger holds a false entry, and — because the
|
||
barrier operator at the sites closes **only when its sensor/radar is tripped by a passage** — the
|
||
boom stays up until the next car trips it. That next car enters with no ticket, no read, no ledger
|
||
row. So an abandoned entry is both a wrong row and a free pass. Related: the FIFO stale-occurrence
|
||
problem seen on AB694XU the same day (an exit closes the oldest open occurrence; one double read
|
||
leaves a subscriber permanently one stay behind).
|
||
|
||
**Constraint (user).** The cameras are the cheap Hikvision DS-2CD1043G2-LIU: motion push with a
|
||
vehicle target, a sub-stream, and no line-crossing / smart events. The booth PC does the thinking.
|
||
Cameras are sensors; compute is ours. The Dahua bench unit has tripwire (`CrossLineDetection`) but
|
||
that is not the fleet camera.
|
||
|
||
## Design
|
||
|
||
1. **Frames: the RTSP sub-stream, not ISAPI stills.** Keep one RTSP session open per camera
|
||
permanently (avoids the keyframe start-up gap of 1–2 s; set the sub-stream I-frame interval to
|
||
≤ 1 s). Decode in the vision service (OpenCV 4.13 with FFmpeg is already in the container; no
|
||
`ffmpeg` binary needed). The still-pull loop in `anpr-entry.ts` is replaced by this — it also
|
||
removes the single-threaded picture-endpoint collisions (503s).
|
||
*Latency (user asked 2026-10-24):* RTSP itself adds nothing meaningful; the delay is the
|
||
camera's encoder (~100–300 ms) plus whatever the decoder buffers. Open the stream with a
|
||
minimal buffer (`CAP_PROP_BUFFERSIZE 1`, TCP transport, drop to the newest frame), and the
|
||
watcher sees a frame well under half a second after the event. The 1–2 s start-up gap is a
|
||
keyframe wait, which is why the session stays open. To be measured on park-lab against the
|
||
motion-push timestamp once a camera is on the bench.
|
||
2. **Trigger and window.** Nothing runs while the lane is empty. A motion push starts a *watch* on
|
||
that camera; it holds while pushes keep arriving (1–3 s apart while a car moves — see
|
||
[[lane-presence-and-anpr-entry]]) and ends a few seconds after they stop, or at a hard cap.
|
||
3. **Detection + tracking.** The existing YOLOX vehicle detector gives a box per car; a small
|
||
in-house tracker matches boxes between frames by overlap and follows each track's
|
||
**bottom-centre point** (ground contact; stable under perspective). No tracker library.
|
||
4. **The segment.** Drawn once per camera in Setup over a live frame; stored as two normalised
|
||
points + which side is A, in the same normalised frame the plate/vehicle boxes already use.
|
||
Crossing = sign change of the cross product of the tracked point against the segment. A→B on
|
||
the entry camera is a passage; the exit camera has its own line. A→B→A inside the window is a
|
||
reversal (not a passage). The verdict carries the track's plate if ANPR read one on it.
|
||
5. **One watcher, two consumers.** The same decoded frames feed the ANPR bridge (subscriber
|
||
auto-open) and the crossing tracker (confirmation).
|
||
6. **Lane state becomes positive.** Busy while any track is between the line and the boom; free
|
||
when the last track crossed or left the frame; the 30 s TTL stays only as a fallback when the
|
||
stream is down. `vehicle_passed` ⇒ lane free *unless another track is present* (tailgating).
|
||
This is the software form of the pass-through sensor [[entry-double-press]] asked for.
|
||
|
||
### Ledger semantics (append-only, unchanged open path)
|
||
|
||
- `vehicle_entry` / `vehicle_exit` remain **intent**: the barrier was commanded open. The open is
|
||
never delayed by confirmation.
|
||
- `vehicle_passed` (new, signed): the crossing was seen, with how (vision track) and the plate.
|
||
- `entry.abandoned` / `exit.abandoned` (new, signed): window ended with no crossing. Closes the
|
||
occurrence; a printed ticket is **invalidated** so the paper cannot be handed to the next car.
|
||
- *unverified*: vision/stream unavailable — recorded as such; the stay counts (benefit of doubt).
|
||
Occupancy and the active list count passed + unverified; abandoned are listed as what they are.
|
||
A subscriber's stay only exists once the car is seen to cross — which also kills the stale
|
||
FIFO occurrence at its root.
|
||
|
||
### Closing the boom after an abandonment — evidence-driven, never timed
|
||
|
||
[[barrier-not-a-door]] stays: no timed close. A close may be **expressed** (a pulse on a spare
|
||
Dingtian channel into the operator's *close* input) only when **all** hold: an abandoned verdict;
|
||
the tracker reports nothing between the line and the boom and nothing approaching, for a few
|
||
seconds; no new open since; the watch is alive (stream up, verdict fresh); and the close is itself
|
||
a signed event with the last frame attached. Vision down ⇒ no close, ever (today's behaviour).
|
||
The operator's safety devices (loop / photocell) must be verified to override a close command
|
||
on the real unit before this ships. Requires a revision (not repeal) of the standing decision,
|
||
with the test results attached.
|
||
|
||
## Test plan — on park-lab (user, 2026-10-24: "we will test it on park-lab")
|
||
|
||
0. Verify the interlock with a meter: hold the open relay, pulse the close relay, `DOWN` must stay
|
||
dead. Then assert `UP` and `DOWN` together on the unit: open must win.
|
||
1. Confirm the operator's close input; wire a spare relay to it.
|
||
2. Close with a car on the safety loop → boom must not move / must reverse.
|
||
3. Close with the photocell beam broken by a person → same.
|
||
4. Reversal: open, back out, window expires → close pulses, boom comes down.
|
||
5. Tailgate: second car approaching while the first backs out → the tracker holds the close.
|
||
6. Vision service stopped: reversal again → boom stays up, event logged unverified.
|
||
|
||
## Measured on park-lab (2026-10-24, i5-9500, vision container, CPU only)
|
||
|
||
YOLOX-S ONNX, input fixed at 640 by the exported graph (smaller inputs need a re-export):
|
||
|
||
| intra-op threads | ms / frame (p50) | ≈ fps on that budget |
|
||
| --- | --- | --- |
|
||
| 2 (service default) | 132 | 7.5 |
|
||
| 4 | 79 | 12.5 |
|
||
| 6 | 66–70 | 14 |
|
||
|
||
Decode of a 704×576 sub-stream frame is < 1 ms (MPEG-4 part 2 proxy; H.264/H.265 will be a few
|
||
ms) — negligible next to inference. So one lane at 5–6 fps costs ~0.7–0.8 of two cores during a
|
||
watch and nothing between watches; two lanes at once need 4 threads or detection on alternate
|
||
frames with the tracker interpolating. Cheaper still: re-export YOLOX at 416 (~2.4× fewer FLOPs)
|
||
or switch to YOLOX-Tiny/Nano for the tracker (the plate stage keeps its own detector).
|
||
|
||
## park-lab rig (2026-11-15)
|
||
|
||
Two cameras mounted on **one physical lane that serves both directions** (user, 2026-11-15):
|
||
|
||
| | Entry camera | Exit camera |
|
||
|---|---|---|
|
||
| Address | `10.0.10.6` | `10.0.10.7` |
|
||
| Model | DS-2CD1083G2-LIU (8MP, V5.8.4) | DS-2CD1043G2-LIU (4MP, V5.8.10) |
|
||
| Sub-stream (102) | 1280×720 **MJPEG**, 12.5 fps (was 640×360 H.264, keyframe every 4 s) | 1280×720 **MJPEG**, 20 fps (was 640×360 H.264, keyframe every 2.5 s) |
|
||
| Line crossing / intrusion (`ISAPI/Smart/LineDetection`, `FieldDetection`) | `notSupport` | `notSupport` |
|
||
| Motion detection | on, target `vehicle`, grid drawn | on, target `vehicle`, grid drawn |
|
||
| Alarm server (`httpHosts`) | the dev machine `10.0.10.203:3000` (user, 2026-11-19) | the dev machine `10.0.10.203:3000` (user, 2026-11-19) |
|
||
|
||
Read from the cameras over ISAPI the same day; bench snapshot results are on [[lpr-camera]].
|
||
|
||
> **Addresses vs. the 2026-11-15 record (2026-11-17):** read again over ISAPI, `.6` answers as
|
||
> DS-2CD1083G2-LIU (8MP, V5.8.4, main 3840×2160 12.5 fps) and `.7` as DS-2CD1043G2-LIU (4MP,
|
||
> V5.8.10, main 2560×1440 20 fps) — every attribute swapped as a set against the 2026-11-15 bench
|
||
> table on [[lpr-camera]], so the two units most likely traded addresses between the bench and the
|
||
> park-lab mount. Directions hold (the OSD reads "Hyrje" on `.6`, "Dalje" on `.7`); the table above
|
||
> shows the current state. The same day both sub-streams were switched to **MJPEG** for the booth
|
||
> live view ([[camera-live-view]]), then raised to 1280×720: every frame is now a keyframe, so item 1's "≤ 1 s I-frame"
|
||
> concern no longer applies to these units; the watcher would decode MJPEG (OpenCV can) at
|
||
> ~1 MB/s per camera.
|
||
|
||
- The 8MP model has no line crossing either, so the constraint above holds for both: the booth PC
|
||
does the tracking.
|
||
- ~~Both sub-stream keyframe intervals are above the ≤ 1 s this design asks for (item 1).~~
|
||
Moot since the switch to MJPEG (2026-11-17).
|
||
- Both cameras push to the local dev machine, which runs on a copy of park-lab's database where
|
||
both are registered (bound to Dingtian relay 1, ANPR auto-open on). They push to the dev
|
||
machine, not to park-lab, so a subscriber read there raises the real boom.
|
||
- [[k200l-printer]] records `10.0.10.7` as the park-lab printer's fixed address — the exit camera
|
||
now answers there. To be resolved with the user.
|
||
- **Shared lane — not covered by the design above**, which assumes a camera sees only its own
|
||
direction. Here a car driving in passes the entry camera and then drives away through the exit
|
||
camera's view, and the reverse for a car driving out. Open in "Open questions".
|
||
|
||
## Decided with the user (2026-11-17)
|
||
|
||
- **Layout.** park-lab is **one lane, one barrier** for both directions (relay 1 registered as
|
||
`both`, both cameras bound to it). park-2 and park-buzi have **two lanes, two barriers**.
|
||
- **Every open is watched**, not only ANPR subscriber opens: a ticket printed by someone who then
|
||
drives off leaves the boom up the same way. No A→B passage inside the window ⇒ close.
|
||
- **Scope, phase 1: the close only.** The ledger part (`vehicle_passed`, `*.abandoned`, ticket
|
||
invalidation) is phase 2. The close itself is a signed event from the start.
|
||
- **Wiring.** park-lab: R1 opens, R2 closes (`DOWN`). The user believes R2 is interlocked behind
|
||
R1's NC as [[zkteco-cmp200-barrier]] prescribes; this is **not yet verified**. Relays 3 and 4 are
|
||
**not** interlocked. Until a pair is verified interlocked (a meter on `DOWN` with the open relay
|
||
held), that barrier gets no close.
|
||
- **Relay maps at the other sites (user, 2026-11-19).** **No close relay exists at either site.**
|
||
A close there needs new wiring to the operator's close input first.
|
||
|
||
| Site | R1 | R2 | R3 | R4 |
|
||
|---|---|---|---|---|
|
||
| park-2 | opens the entry barrier | opens the exit barrier | — | — |
|
||
| park-buzi | opens the entry barrier | opens the exit barrier | pulses the entry ticket button when a vehicle is in the drawn zone | — |
|
||
|
||
park-buzi is offline (the site does not run this software).
|
||
Config validation must refuse a close relay that already has a direction or an input role.
|
||
- **The line is our own Line Crossing rule (user, 2026-11-19).** The model is Hikvision's: a
|
||
segment with sides A and B and a direction, where A → B, B → A or A ↔ B is what counts as a
|
||
crossing. The fleet cameras have no such rule, so Setup draws it and the booth's tracker judges.
|
||
|
||
### Unexplained passage — the audit witness (user, 2026-11-19)
|
||
|
||
A vehicle that crosses a barrier's line with **no signed open behind it** is recorded as an
|
||
anomaly, for audit. Typical causes: the booth operator raising the boom with a remote control or
|
||
the operator's own button, which bypasses our relay and leaves no trace today, or a second car
|
||
through on one open (tailgating). It is the independent witness [[append-only-event-chain]] and
|
||
[[reconciliation]] call for: *a physical open with no matching signed command is the fraud
|
||
signal.*
|
||
|
||
- **Matching rule.** One open covers one car, because the barrier closes on the passage. A
|
||
crossing in the open's direction is explained when a signed `barrier_open_command` for that
|
||
barrier exists since the previous crossing there. The command may come from any source: ANPR,
|
||
ticket, QR, an operator button, or a setup test. Each command explains at most one crossing.
|
||
- **Record.** A signed `anomaly`, reason `passage.unexplained` (a new member of the closed reason
|
||
set). It carries:
|
||
- the plate and its confidence, when read;
|
||
- the direction from the line;
|
||
- the barrier and the camera;
|
||
- the evidence still;
|
||
- the crossing time, and the time of the last open that was already used.
|
||
|
||
It is listed in reports and in the shift's Z-report: the operator on duty is the person it
|
||
audits.
|
||
- **Unsigned until it is proven.** The ledger is append-only, so a false anomaly can never be
|
||
removed. Until the crossings are shown reliable on park-lab, candidates go to `device_events`
|
||
(kind `passage-unexplained`) and are checked against what really happened. Signing is switched
|
||
on afterwards.
|
||
- **An abandoned open must stop covering cars.** A turned-back open would otherwise explain the
|
||
next car through. The abandoned verdict therefore marks the open used, so the next car through
|
||
is an unexplained passage.
|
||
- **No camera, no claim.** Periods with the stream or vision down are recorded as unwatched, so a
|
||
missing anomaly is never read as "nothing happened".
|
||
- **Plates of people who are not customers** are kept as evidence. The snapshot retention applies.
|
||
Whether that is enough is a decision still to be made.
|
||
|
||
### Phase-1 order (user, 2026-11-19)
|
||
|
||
The audit record comes first, because it actuates nothing: no relay, no interlock, no safety
|
||
review.
|
||
|
||
1. **Crossing detection.** The tracker over hub frames judges each car against the drawn lines.
|
||
2. **Unexplained passages.** Unsigned candidates in `device_events` first; signed anomalies once
|
||
proven.
|
||
3. **The abandoned verdict.** The close runs as a dry run ("would close now", with the evidence
|
||
frame), and the verdict marks the open used.
|
||
4. **The real close pulse.** Last, behind the per-barrier switch, after step 0 of the test plan
|
||
(the interlock) and the safety tests, and after [[barrier-not-a-door]] is revised.
|
||
|
||
### Phase-1 shape (proposed)
|
||
|
||
- **Built (uncommitted).** Setup → camera → *Crossing line* draws the segment over the live
|
||
picture. You drag across the picture to draw it, drag an end to move it, and can swap A/B and
|
||
pick A → B, B → A or A ↔ B. It is stored as camera `config.crossing` (`CrossingLine` in
|
||
`packages/shared`): two normalised points and a direction, with side A on the screen-left of
|
||
p1→p2. The save validates it, and `null` clears it.
|
||
- The watch is **per barrier**, started by the **open** (any source), not by a camera push. A
|
||
barrier without a drawn line gets no watch and no close.
|
||
- The direction of the open picks the confirming line; "lane clear" must hold on **every** camera
|
||
bound to that barrier (park-lab: a car approaching from the other side holds the close).
|
||
- The close relay is named **explicitly** per barrier in the controller config (never derived from
|
||
the open relay), may have no other role, and is a separate optional driver capability. The driver
|
||
serialises open/close per barrier with open always winning — which does **not** replace the
|
||
hardware interlock (a second server on the same board, e.g. a dev machine, has its own lock).
|
||
- **Dry run first:** the verdict and a "would close now" record with the evidence frame; the real
|
||
pulse sits behind a per-barrier switch, off by default, until the bench tests pass and
|
||
[[barrier-not-a-door]] is revised.
|
||
- Frames come from the live-view hub ([[camera-live-view]]): one MJPEG session per camera, shared.
|
||
- A drawn **line alone may not be enough**: the entry view has parked vehicles in the background,
|
||
so "nothing in view" is never true there. The recordings decide whether Setup also needs a lane
|
||
area.
|
||
|
||
## First recordings — AA890XX manoeuvres (2026-11-19, night)
|
||
|
||
Clips were taken by a dev recorder: both 102 streams, 25 s before to 15 s after each server event,
|
||
stored in `.local-parklab/recordings/`. A prototype ran YOLOX-S on every 3rd/4th frame, with a
|
||
greedy IoU tracker following the bottom-centre point, against the lines drawn in Setup.
|
||
|
||
| Time (UTC) | Ledger | What happened | Entry cam `.6` | Exit cam `.7` |
|
||
|---|---|---|---|---|
|
||
| 16:24:09 | `vehicle_entry` | drove in | A → B at 16:24:12 | no crossing |
|
||
| 16:24:46 | `vehicle_exit` | drove out | B → A at 16:24:51 | no crossing |
|
||
| 16:25:20 | `vehicle_entry` | **turned back** | A → B 16:25:12, B → A 16:25:19 | car never reached it |
|
||
|
||
- **The turn-back is visible**, and the ledger holds a false entry for it: the subscriber now has
|
||
an open stay. This is the case this page exists for.
|
||
- **The entry line sits where cars stop to be read.** In the turn-back the car crossed A → B eight
|
||
seconds **before** the open, then went back over the line. With "A → B after the open" as the
|
||
rule, a car already over the line when the boom rises and then driving on would never cross
|
||
again. It would be judged abandoned, and a close would come down on it. The line must lie
|
||
**beyond the stopping point and the boom**, where a car only gets after passing.
|
||
- **The exit line is off the cars' path.** It is drawn in the bottom-left corner, while cars drive
|
||
along the right half of the frame. Near the frame edge the car is cut off, and the bottom-centre
|
||
point jumps.
|
||
- **On this one-lane rig the entry camera alone saw both directions** (A → B in, B → A out). The
|
||
shared-lane open question leans toward one well-placed line per barrier, with direction from
|
||
the crossing.
|
||
- **The boom swings through the exit camera's view** when it opens (16:24:11–15, 16:24:48–51) and
|
||
stayed in view after the turn-back (16:25:22 onwards, boom still up). That would let a camera see
|
||
that the boom is up, a direct witness of an open by remote control. Not yet confirmed with the
|
||
user.
|
||
|
||
## Field trials — zone PoC (2026-11-21)
|
||
|
||
A standalone prototype tried this design on park-lab with the real relays: R1 live, R2 as a dry
|
||
run. The entry camera judged every move of a night drive right, including nose over the line and
|
||
reverse. The user set the close rule, and the exit camera was dropped because the rising boom
|
||
crosses its image. The details are on [[zone-anpr-poc]].
|
||
|
||
**2026-11-22:** the flow and relay rules below were built into the prototype and run with R2
|
||
live. By day the entry visits were judged as driven, except one turn-back at the boom that was
|
||
decided `passed` while the zone ended short of the picture's edge; the boom came down at every
|
||
abandonment the camera judged.
|
||
On a wet night the plate and the detector did not hold ([[zone-anpr-plate-trials]]). The user
|
||
closed the trials there; what is left to harden is on [[vision-hardening]].
|
||
|
||
## Decided with the user (2026-11-22) — the zone flow and the relay rules
|
||
|
||
### The flow
|
||
|
||
- **A → B is in, B → A is out.** The two are mutually exclusive: a later crossing replaces the
|
||
earlier one, so only the **last** crossing counts.
|
||
- **No decision while the zone is busy**, neither passed nor abandoned. The watch keeps running.
|
||
- **The decision is made when the zone becomes free:**
|
||
|
||
| Zone | Last crossing | Decision | R2 |
|
||
|---|---|---|---|
|
||
| busy | any, or none | none yet | — |
|
||
| free | A → B | passed | nothing |
|
||
| free | B → A | abandoned | fire |
|
||
| free | none: the vehicle did not cross | abandoned | fire |
|
||
|
||
- **The rule behind the last two rows (user):** *"We care if the boom is up (the barrier is open)
|
||
and the transient or subscriber do not cross the barrier, so we flag that entry as abandoned,
|
||
and fire R2 to close the boom."* It holds for ticket holders and subscribers alike.
|
||
- R2 fires only for an open made in that busy period, as before ([[zone-anpr-poc]]).
|
||
- This replaces the six verdicts of the PoC ("moving away", "other direction", "stayed beyond").
|
||
The PoC implements it since 2026-11-22: [[zone-anpr-poc]], "The 2026-11-22 build".
|
||
|
||
**Not settled** (raised by [[zone-anpr-poc-review]], not yet confirmed by the user). The PoC
|
||
build had to pick a default for each; they are listed on [[zone-anpr-poc]]:
|
||
|
||
- **What counts as busy.** The review recommends any vehicle in the zone, on every camera bound to
|
||
the barrier. The PoC build looks at any vehicle in the camera's own zone.
|
||
- **A vehicle the detector loses while it stands in the zone** makes the zone look free. With no
|
||
crossing, that gives abandoned and a close on a standing car (finding 1 there). The review
|
||
recommends that the zone counts as free only when the vehicle was seen leaving it.
|
||
- **A drive-out on park-lab's shared lane is also B → A.** R2 then fires behind a car that has
|
||
left. With the zone empty that harms nothing, but "abandoned" is the wrong word for it once the
|
||
verdict feeds the ledger.
|
||
|
||
### Relay rules
|
||
|
||
- **The close does not look at the boom (user).** No "boom is down" signal is needed for it. What
|
||
matters is that the boom was opened and the vehicle did not cross. *"If the boom is already
|
||
closed that R2 firing will do nothing."* Not yet tried on the unit: a `DOWN` pulse on a closed
|
||
boom belongs in the bench tests above.
|
||
- **A vehicle under the boom is the barrier's concern, not the host's (user, 2026-11-22).** The
|
||
barrier's own radar or infrared sensors keep the boom up while something is under it, whatever
|
||
the relay commands. The close therefore only has to know that the open was not used.
|
||
- So the limit contacts (`O.LM OUT`, `C.LM OUT` on [[zkteco-cmp200-barrier]]) are **not** wired
|
||
for the close. Their use as an audit witness is a separate matter.
|
||
- **What the board reports.** The status read returns each relay's coil state and the inputs
|
||
(`packages/devices/src/drivers/access-dingtian.ts`, command `0x00`). A coil is on only during
|
||
its 500 ms pulse, so this never says where the boom is. The PoC reads it before every pulse.
|
||
- **Read, then fire (user, 2026-11-22).** Before a relay is pulsed, the board's status is read. If
|
||
the other relay of the pair is off, the pulse goes out. Switching a relay off takes no time
|
||
beyond the network, and a pulse lasts 500 ms, so the other relay is almost always off.
|
||
- **When the other relay reads on (user, 2026-11-22).** Send it an off command and read again.
|
||
Once it reads off, fire. If it still reads on, keep trying. The rule is the same in both
|
||
directions.
|
||
- **When the read fails (user, 2026-11-22).** Check whether the relay controller is online. If it
|
||
is, keep looping. If it is not, there is no controller on the network to drive, and the relay
|
||
is flagged **offline**.
|
||
- **Contradiction, noted.** Being the same in both directions, the rule lets a close switch R1 off.
|
||
That is "last command wins", where [[zkteco-cmp200-barrier]] and the phase-1 shape above ask for
|
||
"open wins". It can only bite when an open from another source (the app on the dev machine, an
|
||
operator button) lands in the half second before a close: that open is cut and the boom comes
|
||
down in front of the car it was for. The series interlock still makes open win on the wire.
|
||
- **Built this way in the PoC (2026-11-22), not yet confirmed by the user:**
|
||
- "online" is a TCP connect to the board's web port, a different probe from the status read;
|
||
- 0.1 s between tries; one worker per board, and a newer command replaces one still trying;
|
||
- a close that is still looping when the zone turns busy again is dropped, since the flow
|
||
decides nothing while the zone is busy.
|
||
- The read and the pulse are separate datagrams, and the dev machine drives the same board, so
|
||
the check is not atomic. It does not replace the series interlock, which stays a precondition
|
||
for a live R2.
|
||
|
||
## Open questions
|
||
|
||
- **Hardening the vision side** after the field trials: the work list, deferred on 2026-11-22, is
|
||
[[vision-hardening]].
|
||
- **One lane, both directions (park-lab rig).** The PoC lets one camera own the lane at a time,
|
||
and the entry camera alone judges both directions ([[zone-anpr-poc]]). Every car crosses both cameras' views. Does the far
|
||
camera's motion push for a car moving *away* count as nothing (direction from the track decides),
|
||
and may the far camera's sighting corroborate the passage? Undecided.
|
||
- Re-export YOLOX at 416 vs YOLOX-Tiny for the tracker — accuracy on far cars at the line?
|
||
- ~~Window cap and "lane clear" dwell before a close (start: cap 60 s, dwell 3 s).~~ Decided by
|
||
the user (2026-11-21): no window, no dwell. The close fires as soon as the zone is free and the
|
||
verdict is abandoned. See [[zone-anpr-poc]].
|
||
- Does the DS-2CD1043G2-LIU keep pushing VMD for a car *reversing*? (It should — motion is motion.)
|
||
- Stream-to-event latency and frame drop rate on the booth PC (measure, don't assume).
|
||
- Which barrier operator model is at the sites? The unit on hand is a [[zkteco-cmp200-barrier]]:
|
||
its close input is `DOWN` (dry contact to `G`), and the manual says `DET`/`PHO` reverse a falling
|
||
boom — steps 1–3 can be run on it.
|
||
|
||
Related: [[lane-presence-and-anpr-entry]], [[barrier-not-a-door]], [[entry-double-press]],
|
||
[[append-only-event-chain]], [[opencv-anpr-service]], [[park-2-event-loop-stall]].
|